Weyburn Carbon Capture Utilization and Sequestration Project
Part of the Enhanced Oil Recovery (EOR) projects for the combined Weyburn-Midale oil field
Encana Corporation | Canada | 2000-2008
Recovered an additional104 millionbarrels of incremental oil
Project will extend life of the facility by25 years
EOR incremental production for Weyburn:15,000 bbl/day
More than 1.7 million tonnes of CO2/year
sequestered at Weyburn CO2Enhanced Oil Recovery project
Challenges
- Build largest CO2flood operation in Canada
- Unprecedented technology with no regulatory framework in place
- 长期项目支出
Solutions
- Provided EPCM services for the installation of all surface facilities for the original Weyburn CO2miscible flood.
- Original surface facilities at the Central Process Unit included inlet separation, FWKO’s, two 6000-HP CO2recycle compressors, CO2dehydration, produced water injection, and 55 km of high-pressure CO2distribution pipelines.
- Expansion and upgrading projects included installation of a two-stage 17,500 HP CO2recycle compressors, two CO2dehydration facilities sized for 5,000 t/day of recycled CO2, 530 m3/hr water injection pump, new transformer, a 30,000 bbl water storage tank with booster pumps, and upgrades to FWKO system.
- Field facilities included all production/injection satellites, and production/injection pipelines.
Highlights
- Proved technical and economic feasibility of carbon storage in geological formations
- Proved CO2injection as a viable method for Enhanced Oil Recovery (EOR)
- Provided $3.5 billion in added value to the provincial economy
Project numbers
Projected to store 45 million net tonnes of CO2over the project life6000 t/dof CO2injection,1.8 Mt/yrof CO2injection (equivalent to600,000cars off the road for a year)
How we can help you
如果你有一个职业blem that needs to be solved, please get in touch.